Assigned trucks will follow this harvester which will load them with wood. Trucks will deliver the wood to the factory and return back to the harvester.
Assigned vehicles will be allocated to transfer cargo exclusively for this building. This means that anytime an assigned vehicle performs a delivery this building has to be either source or destination of the cargo. This can be combined with routes assignment to form dedicated supply lines.
Assigned excavators will automatically mine all the mining designations managed by this tower. Don't forget to also assign some trucks so the excavators can unload their shovel.
This furnace has a cooling system to safely reach higher operating temperatures. This provides increased throughput and an opportunity to reuse some of the excess heat. Power requirements are increased as well.
Melts metals via a powerful electric arc. The arc is deployed using graphite anodes that are partially spent during the process due to the high heat. Beware that the furnace consumes a significant amount of power. It would be polite to notify your local power plant before turning this on.