English represents number of people in a settlement, example '2 pops' (keep it short)
represents number of people in a settlement, example '2 pops' (keep it short)
Singular
{0} pop
Plural
{0} pops
AnaerobicDigester__desc
English short description of a machine
short description of a machine
Performs a process in which microorganisms break down biodegradable material in the absence of oxygen to produce fuels and fertilizer.
ArcFurnace__desc
English short description of a machine
short description of a machine
Melts metals via a powerful electric arc. The arc is deployed using graphite anodes that are partially spent during the process due to the high heat. Beware that the furnace consumes a significant amount of power. It would be polite to notify your local power plant before turning this on.
ArcFurnace2__desc
English short description of a machine
short description of a machine
This furnace has a cooling system to safely reach higher operating temperatures. This provides increased throughput and an opportunity to reuse some of the excess heat. Power requirements are increased as well.
English tooltip that explains what excavators do when assigned to a mine tower
tooltip that explains what excavators do when assigned to a mine tower
Assigned excavators will automatically mine all the mining designations managed by this tower. Don't forget to also assign some trucks so the excavators can unload their shovel.
AssignedExcavators__Title
English title of a panel that enables to assign excavators to a building
title of a panel that enables to assign excavators to a building
Assigned excavators
AssignedForLogistics__Empty
English shown when they are no routes assigned
shown when they are no routes assigned
No routes assigned
AssignedTrucks__Building_Tooltip
English tooltip that explains what trucks do when assigned to a general building (e.g. storage)
tooltip that explains what trucks do when assigned to a general building (e.g. storage)
Assigned vehicles will be allocated to transfer cargo exclusively for this building. This means that anytime an assigned vehicle performs a delivery this building has to be either source or destination of the cargo. This can be combined with routes assignment to form dedicated supply lines.